Aufbau und Inbetriebnahme in Rekordzeit - GPIO Solutions

    GPIO Solutions
  • Home
  • Solutions Installation and start of operations in record time
jtl-video

Installation and start of operations in record time

At JTL Connect 2019, we hit our setup time record :

Our pick-by-light system for the demo warehouse is set up and commissioned within 1 hour.

This is made possible by our new brackets with neodymium magnets, among other things.

The video shows the setup as well as the work with Multi Order Picking.

Multi Order Picking = Several picking orders are processed simultaneously.

In this example, fully integrated into JTL WMS of JTL Software (mobile packing table). Thanks to our open interface, the solution can be easily integrated with any system - including SAP.

Also Remodeling your shelving landscape can of course be mastered in a similarly short time with our Pick by Light system.

Modernize and optimize your intralogistics with our Industrie 4.0 solutions.

en_US